Skip to product information
1 of 8

LABINVO

Safety Wash Bottles, Vol.500ml, 6PCS of Lab Rinse Squeeze Bottles, Printed Acetone, Ethyl Alcohol, Methanol, Isopropanol, Distilled Water, Sodium Hypochloride, LDPE Material, IN-WBS001

Safety Wash Bottles, Vol.500ml, 6PCS of Lab Rinse Squeeze Bottles, Printed Acetone, Ethyl Alcohol, Methanol, Isopropanol, Distilled Water, Sodium Hypochloride, LDPE Material, IN-WBS001

Regular price $69.99 USD
Regular price $69.99 USD Sale price
Shipping calculated at checkout.

About This

  • Capacity: 6pcs of 500ml (17oz), each 1PC of acetone wash bottle , Ethyl alcohol wash bottle , Methanol wash bottle, Isopropanol wash bottle, Distilled water wash bottle and Sodium hypochloride wash bottle.
  • O.D×Height: 2.91’’×7.2’’(74mm×183mm), the diameter of mouth is 1.36’’ (34.5mm)
  • Material: Bottle is made of LDPE(Low Density Polyethylene) material which has good flexibility, elasticity, and impact resistance, draw tube is made of PP(Polypropylene).
  • Superiority: High sealing performance, effectively prevent the volatilization of liquid
  • Appearance: These wash bottles have a label with chemical name, the chemical formula of the International Chemical Society (ICS) and the Chemical Abstract Service (CAS) number.

Overview

  • Brand : LABINVO
  • Material : Plastic
  • Bottle Type : Wide mouth bottle
  • Color : Safety Wash Bottles, 6PCS
  • Capacity : 500 Milliliters
View full details